OEM / ODM Manufacturer Since 2006

Portable Power Stations

Twelve platforms from 300W to 6000W, sharing one BMS architecture — so your brand can launch a compact carry model today and scale up to a 6kWh wheeled unit tomorrow with a model-specific review of any additional testing or documentation needed.

Standard OEM MOQ starts at 100 units; flexible trial orders may be available for qualified new brand partners. Sample 15 days MP 45 days CE / FCC / KC / RoHS

Quick Facts — For Brand Buyers

  • Wattage range: 300W – 6000W continuous, peak up to 12000W
  • Battery: LiFePO4 (2000+ cycles), Sodium-ion (3000+ cycles)
  • Capacity: 192Wh – 5018Wh
  • OEM MOQ: Standard OEM MOQ starts at 100 units; flexible trial orders may be available for qualified new brand partners.
  • Lead time: Standard-platform samples approximately 15 days; production approximately 45 days; confirmed quotation applies
  • Certifications: CE, FCC, KC, RoHS, UN38.3, MSDS

Browse by Model

Click any model to view specs and request a quote.

iFORWAY G02 Portable Power Station 300W | Ultra-Compact with Shoulder Strap - front view

G02

192Wh · 300W · LiFePO4
View Details
iFORWAY M50 Tragbare Powerstation

M5002

5018Wh · 6000W · Wheeled
View Details
iForway M3003 3072Wh / 3000W IP54 LiFePO4 Portable Power Station

M3003

3072Wh · 3000W · LiFePO4
View Details
iFORWAY G24 PRO Portable Power Station - front view

G24 Best Seller

2048Wh · 2400W · LiFePO4
View Details
iFORWAY G24 PRO Portable Power Station - front view

G24 PRO

2048Wh · 2400W · LiFePO4
View Details
G36

G36

3072Wh · 4000W · LiFePO4
View Details
iFORWAY HS3600 Tragbare Powerstation

HS3605

3072Wh · 3000W · LiFePO4
View Details
iFORWAY M5003 Portable Power Station | 5018Wh 6000W / 12kW Peak Off-Grid Generator

iFORWAY M5003 Portable Power Station | 5018Wh 6000W / 12kW Peak Off-Grid Generator

Portable Power Station
View Details
iFORWAY M10 1004.8Wh 500W LiFePO4 Portable Power Station

iFORWAY M10 1004.8Wh 500W LiFePO4 Portable Power Station

Portable Power Station
View Details
iFORWAY M20 2009.6Wh 1200W LiFePO4 Portable Power Station

iFORWAY M20 2009.6Wh 1200W LiFePO4 Portable Power Station

Portable Power Station
View Details
iFORWAY G20 Solar Generator - front view

iFORWAY G20 Tragbare Powerstation

Portable Power Station
View Details
iFORWAY HS500 Solar Generator - front view

iFORWAY HS500 Tragbares Powerstation

Portable Power Station
View Details
iFORWAY HS800 Portable Power Station - front view

iFORWAY HS800 Tragbare Powerstation

Portable Power Station
View Details
HS1800

iFORWAY HS1800 Tragbare Powerstation

Portable Power Station
View Details
iFORWAY HS1200 Portable Power Station | 1024Wh 1200W / 2400W Peak

iFORWAY HS1200 Portable Power Station | 1024Wh 1200W / 2400W Peak

Portable Power Station
View Details

Compare All Models

ModelCapacityOutputBatteryCyclesSolar InputBest For
G02192Wh300WLiFePO42000+150W / 12-28VCompact carry, backupDetails →
M101005Wh500WLiFePO42000+500W / 12-60VLight RV, camping—
HS800768Wh800W rated
1600W peak
LiFePO42000+DC: 240W / 7A
XT60: 240W / 12A
12–60V DC
Outdoor, eventDetails →
M202010Wh1200WLiFePO42000+600W / 12-60VFamily camping, home backup—
G201536Wh1800WLiFePO42000+800W / 12-60VRV, off-gridDetails →
HS18001024Wh / 1536Wh1800W rated
3600W peak
LiFePO42000+DC: 400W / 7A
XT60: 800W / 20A
12–60V DC
Mobile work, eventsDetails →
G24 Best Seller2048Wh2400WLiFePO42000+1200W / 12-60VOutdoor, RV, mid home backupDetails →
M30033072Wh3000WLiFePO42000+1200W / 12-60VWhole-room backupDetails →
HS36003072Wh3000WLiFePO42000+—Home energy storage—
G363072Wh4000WLiFePO42000+1600W / 12-150VHigh-power tools, off-grid homeDetails →
M50025018Wh6000WLiFePO42000+1600W / 12-60VWheeled, job site, whole-homeDetails →
M5003 Flagship5018Wh6000WLiFePO42000+1600W / 12-60VJob site, whole-home, heavy loadDetails →

For HS800 and HS1800, DC and XT60 limits are specified separately per port, not as a combined-input rating. Confirm any simultaneous-input capability for the supplied configuration.

How to Choose

01

Define your load

Add up the rated wattage of devices you need to run. Multiply by 1.2–1.5x for startup surge. Choose a station with continuous output above that number.

02

Match capacity to runtime

Runtime (hours) ≈ Capacity (Wh) × 0.9 ÷ Load (W). For all-day off-grid target 2000Wh+. For overnight backup, 1000–2000Wh is usually enough.

03

Pick battery chemistry

LiFePO4 for 2000+ cycle life and safety. Sodium-ion for extreme cold (-20°C). NMC for ultra-light power banks.

OEM / ODM on Every Model

Every model above can be customized for your brand:

Custom Logo

Silk-screen, laser engraving or full wrap-around branding.

Custom Color

Pantone-matched enclosure, bezels and packaging.

Firmware

BMS parameters, APP UI, cloud platform, boot screen.

Packaging

Retail box, user manual, accessory kit to your spec.

FAQ

What is the MOQ for OEM branding?

Standard OEM MOQ starts at 100 units; flexible trial orders may be available for qualified new brand partners. Private tooling is quoted separately. For standard-platform projects, allow approximately 15 days for samples and approximately 45 days for mass production after specifications and commercial terms are approved. New tooling, engineering changes, testing, certification work and material availability can change the schedule; the confirmed quotation and production plan control.

Which certifications do your power stations carry?

Documentation availability depends on the exact model, configuration and destination market. Request matching certificates, declarations and test reports before ordering; a listed standard or logo is not evidence that every product is approved for every market. Do not assume a UL listing; request independently verifiable evidence for the exact model if your channel requires it.

Can you customize the BMS and APP?

Yes. In-house R&D covers ID design, structural, hardware, firmware and IoT cloud. Modifications include output socket layout, voltage curves, APP UI, Wi-Fi/Bluetooth.

How long is mass production lead time?

For standard-platform projects, allow approximately 15 days for samples and approximately 45 days for mass production after specifications and commercial terms are approved. New tooling, engineering changes, testing, certification work and material availability can change the schedule; the confirmed quotation and production plan control.

Do you support sodium-ion battery options?

Yes. We can develop sodium-ion variants of existing platforms for cold-weather operation down to -20°C.

How is production quality controlled?

Every unit tracked by serial number through MES, from cell lot to final aging test. Each unit passes a 4-hour burn-in before shipment.

Need a Custom Power Station Program?

Send us your target specs, market and quantity. Get a datasheet and quotation within 24 hours.